Wood Group has combined with Amec Foster Wheeler to form a new global leader in the delivery of project, engineering and technical services to energy and industrial markets. To find out more about Wood visit our new website at www.woodplc.com

Condition assessments

Amec Foster Wheeler has engineered and designed over 225 GWe of steam generation equipment over the past 100 years. Whether your needs are simple or complex, short-term or long-term, Amec Foster Wheeler has the experience and time-tested technical experts to provide your company with “value added” information and lasting solutions to your problems.

Why condition assessment?

  • Units are being cycled daily due to legislation and environmental regulations
  • High cost of accelerated damage due to cycle fatigue
  • Decreased maintenance budgets and reduced outage schedules
  • Average age of steam generating assets is over 30 year
  • Amec Foster Wheeler has the experience and resources to implement comprehensive Boiler Condition Assessment Programs


Level I condition assessment

A plan is prepared after a thorough review of the plant's operations (both current and historical). Level I Condition Assessment involves detailed visual inspection techniques, simple NDE methods (MT, PT, UTT) and measurement tools to determine if more detailed analysis is required. The components generally inspected are:

  • Boiler structure and supports
  • Burners
  • Critical planning
  • Downcomers
  • Flues and ducts
  • Headers
  • Waterwalls
  • Steam drums


Level II condition assessment

Based on the findings observed during a Level I inspection, more advanced NDE techniques and sampling are utilized, which include:

  • Advanced UT (PAUT)
  • Hardness / PMI
  • High temperature strain gages
  • Metallurgical and Oxide analysis of tube samples
  • Remote visual inspection
  • Surface replications
  • UT–oxide thickness
  • WFMT


Level III condition assessment

Advanced engineering analysis should be employed when "remaining life” of a component or engineered solutions are required. These services include:

  • Engineering studies
  • EPRI remaining life software tools: TULIP, BLESS, Creep-Fatigue Pro
  • Finite element analysis
  • Fracture mechanics
  • Performance based
  • Stress analysis 


Parts impulse

We offer a full range of steam generator equipment, aftermarket products and services to the power, industrial, and wasteto- energy sectors. Our global manufacturing and engineering network can deliver cutting-edge products and expertise, quickly and cost competitively with best-in-class quality.

Return to topTop