Wood Group has combined with Amec Foster Wheeler to form a new global leader in the delivery of project, engineering and technical services to energy and industrial markets. To find out more about Wood visit our new website at www.woodplc.com

Delayed coker heaters

We are the industry leader in delayed coking technology: the SYDECSM technology is world-renowned. 

The most important piece of equipment in a delayed coker unit is the fired heater: an Amec Foster Wheeler delayed coker heater lies at the heart of the SYDEC process and all delayed cokers we design use an Amec Foster Wheeler fired heater, delivering economical and flexible operation with guaranteed on-stream factors.

Our delayed coker heater designs are based on many years of experience. We have provided over 130 delayed coker heaters in over 60 plants worldwide.

In this demanding service, carefully controlled time/temperature profiles are critical for profitable production. Furnace residence time must be rigidly controlled to avoid premature coke formation in the tubes, resulting in a unit shut-down.

On delayed coker units, our fired heater specialists work with our process teams to develop the optimum design tailored to our clients' specific operating conditions, as well as designing for conditions such as spalling operations.

Two types of design are available for this service:

  • Single-fired cabin- or box-type heaters with horizontal tubes and bridge wall
  • Terrace Wall™ double-fired heaters, sloped-wall type, with horizontal tubes.

Contact us

To reach an Amec Foster Wheeler representative, fill in the form below.

This field is required

This field is required

This email address is not valid

This field is required

This field is required

This field is required

Please do not use this form for career enquiries. Visit amecfw.com/careers

Contact us

Thank you for contacting Amec Foster Wheeler.

We will be in touch with you soon.

Return to topTop